Services

Four things, and we do all four ourselves.

There is no design partner and no labour-only subcontract. The engineer who calculated the duty is the one who signs the commissioning sheet, which is the only arrangement under which anyone can be held to a number.

Book a survey

01

Design and duty calculation

Room-by-room heat gains, fresh-air rates to Building Regulations Part F, and a coil selection with the psychrometrics done rather than assumed. You get the state points, not just a kilowatt figure.

02

Install

Air-handling plant, chilled water, VRF and air-source heat pumps, ductwork to DW/144, and the electrical and controls work that goes with them. Our own fitters, no labour-only subcontract.

03

Commissioning

Air volumes proportioned and recorded to CIBSE Commissioning Code A, water systems balanced, and every coil checked against its design condition on the day. Signed sheets, not a tick box.

04

Service and breakdown

Planned maintenance on a fixed visit rate, statutory F-Gas leak checks logged, and a four-hour response for contract sites. Most breakdowns we attend are condensate, filters or controls.

A glazed link corridor with a continuous supply air slot along its ceiling
Netherbank Health Centre — six air changes an hour, measured at NR 29 in the worst room on handover.

What it costs

Site survey and duty calculation Measured heat gains, air volumes and a psychrometric check on every coil. £340 fixed, credited against the install
Planned maintenance visit Filters, belts, condensate, refrigerant leak check, F-Gas log. £185 per visit, per plant item
Breakdown call-out Contract sites carry a four-hour response, seven days. £96 first hour, £64/h after

Install prices are quoted per job after a survey. Anyone quoting an install without having been in the building is quoting a guess.

Start with the survey.

£340, fixed, and credited in full against the install if you go ahead with us.